Technical feasibility

SECTION I: Testing

1

Has the R & D result been tested?
YES X
NO  

If yes:

1a

In what mode has the result been tested?

•   Prototype

•   Pilot Application

•   Alpha/BETA testing

The computer application JOB was developed in prototype form by the company Ud’Anet in 2006 and it has been tested (beta test) by the division orientation of the University G. D’Annunzio of Chieti – Pescara during the 2007-2009 period.

1b

Please describe and discuss the testing results
During the period 2007-2009 were included in the system JOB approximately 400profiles university students and have joined the beta test approximately 150 companies that can host trainees. In During 2007 was launched the beta test on the automatic export of profiles university students and the importation into the information system of labour national stock exchange . The test results were positive and described the application prototype was finally adopted in 2010 by the division orientation G.d’Annunzio University.

If no:

1c

Describe what type of testing does the R&D result need?
 

1d

What is the time needed for testing?
 

1e

What is the cost needed for testing?
 

SECTION 2: Current Stage of Development

2a

To what extent does the development team have technical resources for supporting the production of a new product? (Researchers, human resources, hardware, etc.)
Currently the development team Ud’Anet prototype system also monitors and conducts technical assistance. In order to give full outcome to the system would be need to displace this resource on a dedicated hardware platform and expand the human resources team with at least 2 new developers for adding new functionality to the system of export profiles and cross supply and demand and Web 2.0

2b

What are the technical issues that need to be tackled for full deployment, if needed?
The technical issues to be addressed are mainly the following:

  • Design of new computing capabilities;
  • Development of new functionality using OS languages​​;
  • Adjustment of the key data and redesign of RDBMS;
  • Development of the mobile interfaces.

Data export in XML format for synchronization profiles with the new labour national stock exchange

2c

What additional technical resources are needed for the production of this new product?
N. 1server web dedicated in hot backup;

N. 2 licenses for Zend suites feature development.

2d

Overall assessment of the current stage of technical development.

In the present state the development of the basic functionality of the system is terminated. Should be implemented at the request of the division orientation at the University of Chieti, new functions, aimed at meeting more users and export data.

SECTION 3: Deployment

3a

Define the demands for large scale production in terms of
  • Materials
As a product computerized (web application for the management of CVs), the raw material is essentially the invention and the design human, in addition to the technological systems necessary to use.
  • technologies, tools, machineries
N. 1 server dedicated multiprocessor hot backup via.
  • Staff effort
Project manager 1 month/man

Coordination service orientation 0.5 months/man

Senior programmer analyst 2 months/man

Junior Analyst Programmer 8 months/man

SECTION 4: Overall Assessment

1

What is you overall assessment of the technical feasibility of the research result?
The evaluation on the technical feasibility of the development plan system JOB is to be considered positive if it can adequately enhance the development team Ud’anet.

KEYWORDS QUANTITATIVE ASSESSMENT (0-5).

Adequacy of testing activity undertaken so far

1

2

3

4

X

Adequacy and availability of technical resources of the development team

1

2

3

4

X

Current development stage

1

2

3

X

5

Overall technical feasibility

1

2

3

4

X

Bookmark the permalink. Follow any comments here with the RSS feed for this post. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.

Request a proposal

Valorisation Plan Authors

Related Documents

There in no related documents

Visit the other applications of the INTERVALUE Platform: R&D Repository | IP Agreements

© 2009-2010 INTERVALUE Project