IP protection

PART a: IDENTIFICATION OF R&D Result                                                                      

PARTEA A: Identificarea rezultatului cercetării-deZvoltării (CD)

·         The project team

Echipa proiectului

Advisor’s Name:Nume: Department of Technologies and MaterialsProject: The simulation of the measurement process for a complex part on a coordinate measuring machine
Phone:Telefon:  +40.723. 163396
E-mail: dumitrudc10@yahoo.com 
Expecting date of valorization plan submission:Data aşteptată pentru trimiterea planului de valorizare  27.01.2012

·         Identification of R&D activity

Identificarea activităţii de cercetare-dezvoltare (CD)

Acronym:Acronim:

DTM

Author of the R&D result:Autorul rezultatului CD:  Dr. Eng. Gherghina George
Company or University:Companies au universitate:  UNIVERSITY OF  CRAIOVA, ROMANIA 
Phone:Telefon:  +40.745.505251
E-mail:  gherghinag@yahoo.com
Sector:Domeniu:  ENG – Engineering
Type of the R&D result:Tipul rezultatului CD:   Software products

PART B: VALORISATION PLAN

Partea B: Planul de valorizare

1

Please provide a short description of the state-of-the-art and/or current trends in the field? How does the result fit into it?

Vă rugăm să faceţi o scurtă prezentare a celor mai importante realizări în domeniu şi/sau tendinţele actuale? Cum se încadrează rezultatul CD în acest context?

The present day conditions of a harsh competition, a products and services internationalised exchange raises vital problems concerning to the economical assurance of quality. In these conditions the theoretical model form and aspect transmitting on the a piece (product) present different difficulties for those solution are necessary complex technologies and tool machines, in especially, in the case of solid materials at which the field of the geometrical dimensions measurements covers 60-90%.

The objectification and automation of the quality monitoring, decrease of dispersion for mechanical processes simultaneously with the increase of the precision for dimensions and geometric forms, the execution prevention of the unsuitable pieces were made that the using of the coordinate measuring systems should be imposed by universality, precision, productivity especially in the case of complex pieces.

It is presented the dates of methodology for establish the measurement strategy by coordinate machine for a complex piece.

By representing files of the base elements under CAD are geometrically modeled the structure of a coordinate measuring machine, finally resulting the representation from figure1, which is imported in 3Dstudio, then.

The whole modeling program is open permitting the intervention on data for the modification after wish of some constructive values for the model.

 

Simulation method presented gives information about the control possibilities of pieces which will be measured, permitting yet from the design phase the establishment of the adequate measuring strategy which has an essential role in the determination of the measuring accuracy.

 

2

What is the problem/need/knowledge gap that the research result is responding to?  How was it addressed before?Care este problema/necesitatea/deficitul de cunoştinţe la care a cărei soluţionare contribuie rezultatul cercetării ? A fost acest aspect abordat anterior?
Knowledge gap which research results is addressing:
- Lack of knowledge on the strategy for measuring the coordinate measuring machines;
- Simulation of the measurement process;
- Quality is a priority objective which print a strict technological discipline that sets clear responsibilities and spheres of action;
- Linking inputs to outputs in an industrial system for making a reliable product to user demand in a competitive market;
Research focused on the design and implementation of a software for “The Simulation of the Measurement Process for a  Complex Piece on the Coordinate measuring machine”.

 

3

What is the potential for further research?Care este potenţialul pentru cercetarea viitoare?
Scientifically and technically, it is required to develop numerical models for “The Simulation of the Measurement Process for a Complex Piece on the Coordinate measuring machine”.The result of research ranks among the research directions pursued on complex pieces measuring processes, with effect on he quality of parts measured.

The need to develop high quality software is justified by the need to drastically limit rebuffs in case of complex parts.

 

 

4

What is the proposed method of IPR-protection? (patent, license, trademark etc.)Care este metoda propusă pentru protecţia drepturilor de proprietate intelectuală (brevet, licenţă, marcă înregistrată etc.)
It is proposed the protection of intellectual property rights of “The Simulation of the Measurement Process for a Complex Piece on the Coordinate measuring machine” by licensing the technology.

 

5

What are the steps that need to be taken in order to secure the IPR-protection? What is the cost of IPR-protection?Care sunt etapele ce trebuie parcurse pentru a se asigura drepturile de proprietate intelectuală? Care este costul pentru asigurarea proprietăţii intelectuale?
The main steps that may be mentioned in the license contract refers to:
- The right to unlimitedly use license;
- The geographical area the license is covered;
- Duration of time and causes that can cause withdrawal of the license;
- Set of services that the licensee shall grant to the beneficiary company;
- Measures to protect designs, technologies and other items subject to intellectual and industrial property.

 

6

What is you overall assessment of the scientific maturity of the research result?Care este evaluarea generală a maturităţii ştiinţifice a rezultatului CD?
Develop a set of original knowledge directed to “The Simulation of the Measurement Process for a Complex Piece on the Coordinate measuring machine” is the evidence of scientific maturity of the R & D result. Excellent scientific and technological research results consist of:
- constructive optimization of complex parts based on mathematical models;
- Fidelity of computer simulations depends on accuracy of mathematical models used and the way they are assembled. 

Mathematical model presented it is ready for application, though various adaptations might be required depending on the users’ specific needs.

 

The current state of knowledge, theoretical approaches and practical implementations reveals that the solutions presented are real and feasible.

KEYWORDS QUANTITATIVE ASSESSMENT (0-5).

Evaluare cantitativă (0-5)

Please put X as appropriate.

Vă rugăm să marcaţi cu X  punctajul considerat corespunzător

1 2 3 4 5
Scientific maturityMaturitate ştiinţifică X
SynergiesSinergii X
State-of-the-art/innovationCele mai importante realizări în domeniu/grad de inovare X
IPR-potentialPotenţialul privind drepturile de proprietate intelectuală X

 

 

We agree that all informations contained in this form to be made public in the project „Inter-regional cooperation for valorization of research results – INTERVALUE”, by publication on the project website: http://www.urenio.org/intervalue/.

Suntem de acord ca informaţiile cuprinse în acest formular să fie făcute publice în cadrul proiectului „Inter-regional cooperation for valorization of research results – INTERVALUE”, prin publicarea lor pe site-ul proiectului, la adresa: http://www.urenio.org/intervalue/.

Bookmark the permalink. Follow any comments here with the RSS feed for this post. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.

Request a proposal

Valorisation Plan Authors

Related Documents

There in no related documents

Visit the other applications of the INTERVALUE Platform: R&D Repository | IP Agreements

© 2009-2010 INTERVALUE Project