Technical feasibility

PART a: IDENTIFICATION OF R&D Result

PARTEA A: Identificarea rezultatului cercetării-deZvoltării (CD)

·         The project team

             Echipa proiectului

Advisor’s Name:Nume: Department of Technologies and MaterialsProject: The study of velocity field of the dynamical air flow developing around the spatial structure of  a petroleum coke plant using the FEM
Phone:Telefon:  +40.765.490314
E-mail: dumitru.violeta@yahoo.com 
Expecting date of valorization plan submission:Data aşteptată pentru trimiterea planului de valorizare  17.02.2012

·         Identification of R&D activity

Identificarea activităţii de cercetare-dezvoltare (CD)

Acronym:Acronim:

DTM

Author of the R&D result:Autorul rezultatului CD:  Dr. Eng. Talu Mihai
Company or University:Companie sau Universitate:  UNIVERSITY OF  CRAIOVA, ROMANIA 
Phone:Telefon:  +40.745.354825
E-mail:  mihai_talu@yahoo.com
Sector:Domeniu:  ENG – Engineering
Type of the R&D result:Tipul rezultatului CD:   Theoretical Studies

PART B: VALORISATION PLAN

Partea B: Planul de valorizare

SECTION I: Testing

SECŢIUNEA I: Testarea/încercarea

 

1

Has the R & D result been tested?A fost testat/încercat rezultatul CD?

YES

Da

NO

Nu

NO

 

The following question is replied according to the reply in question 1

Următoarea întrebare este formulată în legătură cu răspunsul la întrebarea 1

 

If yes

Dacă răspunsul a fost DA:

 

1a

In what mode has the result been tested?•           Prototype

•           Pilot Application

•           Alpha/BETA testing

În ce mod a fost testat/încercat rezultatul?

•           Prototip

•           Aplicaţie Pilot

•           Incercare Alpha/BETA

 
1b. Please describe and discuss the testing resultsVa rugăm să descrieţi rezultatele testate/încercate

 

If no:

Dacă răspunsul a fost NU:

1c

Describe what type of testing does the R&D result need?Descrieţi ce tip de testare/încercare necesită rezultatul CD?
Detailed commentComentariu detaliat

 

This paper presents a part of results concentring the simulation of the aerodynamics flow velocity field developing surround a petrocheminidty petroleum coke plant. The spatial distributions of velocity us rezults as impact between the air and the spatial structure of plant.

The punctual values of velocity are determinated through nimerical simulations using the FEM which have initial data determinated through experimental measurements. Afther this calculus the therotical rezults are comparated with the real corresponting errores. The Cosmos Flow 2007 software was used to make the analysis through nimerical simulation. The obtained results confirm the accuracy of method and assure the possibility to use this method with confidence in activity of design process of a petroleumm coke plant.

1d. What is the time needed for testing?Care este perioada de timp necesară testări?
Time for testing, probing and homologation is estimated to be within 30 working days.
1e. What is the cost needed for testing?Care este costul necesar pentru testare?
Research costs are estimated at Euro 2500. Costs related to testing, probing and homologation of functional model are estimated to be 1200 Euro.

SECTION 2: Current Stage of Development

SECŢIUNEA 2: Stadiul actual de dezvoltare

 

2a

To what extent does the development team have technical resources for supporting the production of a new product? (Researchers, human resources, hardware, etc. )În ce măsură dispune echipa de resursele necesare pentru a asigura fabricarea noului produs? (Cercetători, resurse umane, hardware, etc.)
University of Craiova, a higher education institution with a specific structure of education, has managerial experience in scientific research performance, both fundamental and applied research in all areas, and advice and expertise.The research & development team has the human resources for the study of field velocity speed developed around the spatial structure of a petroleum coke plant using the FEM.
The research result is the outcome of research and experimentation conducted by a team of experts who want to further optimize these results.
In this respect, the team of experts is available for technical advice, so that potential partners can begin assimilating these results.

2b

What are the technical issues that need to be tackled for full deployment, if needed?Care sunt aspectele tehnice ce trebuie abordate pentru lansarea în fabricaţie, dacă sunt necesare?
Implementation of research results in designing of a petroleum coke plant involves the development of the following stages:
- Development of design concept and requirements;
- Prototype design;
- Prototyping and testing
- Experimentation
- Verification and validation of the model (building the model with a high degree of validity;
validation of model assumptions, comparing quantities of input / output model with the ones of the real system).

2c

What additional technical resources are needed for the production of this new product?Ce resurse tehnice suplimentare sunt necesare pentru fabricarea acestui nou produs?
The spatial model of plant is made with aid of the SolidWorks 2007 software starting an  original execution drawings of the installation.

 

The dimensional sizes of plant are big 28 x 6 x 6 m3 and the geometry is complicated. The 3D isometric model of the petroleum coke plant view from the direction taper bottom to dome is given.

To this end, conditions are required, such as: high pressure, reliability. To fulfill these conditions further research is needed to be done by companies specialized in the field.

 

 

2d

Overall assessment of the current stage of technical development.Evaluarea generală a stadiului actual de dezvoltare tehnică
Detailed commentComentariu detaliat

 

In Romania the production of petroleum coke in majority of cases is based on the method of tardy carbon-producing. This study developed in this paper is concentrated on investigation of the velocity field developed around a petro-chemistry petroleum coke plant which working a 1996 on the Onesti oil distillery platform.

 

The real installation is set constituted with four identical section (fig, 1) and which alternatively work in cycles by 48 hours in according with the algorithm of the technological process.

 

The solicitation of wind represents an important loading which must obligatory to take into consideration in design activity of plant.

For this reason is demanding to make a detailed investigation of velocity field which is straight lied with other sizes as pressure, viscosity and density as it show in the Navier-Stokes equation used to describe the dynamical flow of the real fluids.

SECTION 3: Deployment

SECŢIUNEA 3: Lansarea în fabricaţie

3a

Define the demands for large scale production in terms ofDefiniţi cererea pentru producţia de masă în funcţie de:
  • Materials
  • Materiale
Procurement of materials and components for prototyping can be made of current products supplied by specialized companies.
  • technologies, tools, machineries
  • Tehnologii, utilaje, maşini
On the exterior surfaces of the reinforcing ringa 1, 3, 5, 7 and 9, noted in concordance with execution drawing, are mouted a number of 15 sensor elemtes in points P1 to P15 placed included in Plane 1 and Plane 2 wich scope to measure the punctual values of the velocity field which are connected the Multilyzer analyzer.
  • Staff effort
  • Resurse umane
Human resource requirements estimated for assimilating the new model of equipment will be:
- Staff to survey the market,
- Staff for investment,
- Staff for operator’s training    and
- Staff for activities of advertising, publicity and expertise.

SECTION 4: Overall Assessment

SECŢIUNEA 4: Evaluare generală

1

What is you overall assessment of the technical feasibility of the research result?Care este evaluarea generală a fezabilităţii tehnice pentru rezultatul CD?
Analyzing the distribution fields of velocity as a result of the experimental measurements and theoretical calculus we can conclude that the distributions velocity is no uniform on whole surface of petroleum coke plant.The complex geometry of the external surface disturbing in totality without exceptions the distribution field of velocity over/under lateral of 3D metal structure of plant and trajectories of the fluid elements are complex curves in space.

The calculus of error concerning the results obtained through numerical simulations made with aid of FEM is acceptable under 4 % as results of hypothesis initial accepted that the flow of the atmospheric front have physical sizes homogeneous and the impact angle alpha is constant end equal with value alpha = 900.

The results confirm the possibility of method to assure the precision necessary to use this method with confidence in activity of design a petroleum coke plant.

Technically, the project can be considered as one with minimum risk.

 

KEYWORDS QUANTITATIVE ASSESSMENT (0-5).

Evaluare cantitativă (0-5)

 

Please put X as appropriate.

Vă rugăm să marcaţi cu X  punctajul considerat corespunzător

1 2 3 4 5
Adequacy of testing activity undertaken so farGradul de adecvare al activităţii de testare desfăşurate pănă în prezent X
Adequacy and availability of technical resources of the development teamGradul de adecvare şi disponibilitatea resurselor tehnice ale echipei X
Current development stageStadiul actual de dezvoltare X
Overall technical feasibilityFezabilitatea tehnică generală X

 

We agree that all informations contained in this form to be made public in the project „Inter-regional cooperation for valorization of research results – INTERVALUE”, by publication on the project website: http://www.urenio.org/intervalue/.

Suntem de acord ca informaţiile cuprinse în acest formular să fie făcute publice în cadrul proiectului „Inter-regional cooperation for valorization of research results – INTERVALUE”, prin publicarea lor pe site-ul proiectului, la adresa: http://www.urenio.org/intervalue/.

 

Bookmark the permalink. Follow any comments here with the RSS feed for this post. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.

Request a proposal

Valorisation Plan Authors

Related Documents

There in no related documents